Mid Winter Working Bee
10 Jul by Peter Viney
Hi All ,
Our next working bee will be held on Saturday 19th July starting at 10.00am. As per usual there will be a BBQ lunch provided.
We will be concentration on the following jobs:
1. Installation of the new IHYC sign onto the clubhouse
2.Weeding and wipper snipping the storage yard and surrounds, (moving of the racking will be done in the August working bee).
3. Put levelling mix in the floor cracks,
4. Install shade cloth onto the yard fence.
5. Reinstall weather station (if Steve has found some brackets)
6. Anything else that pops up and can be done.
Hope to see you there.
IHYC Committee